Commercial Glass Portfolio Scope Builder

Build a multi-site schedule and see it drawn as a phased programme.

  • Phased programme chart
  • Schedule of work with specs
  • Procurement and crew days
What kind of portfolio?
Where is the work?Sets the code jurisdiction and which crew is dispatched.
When can we work?

Night and weekend work runs about a quarter slower per unit — protection goes down and comes up every shift, and the space has to be clean before open.

Build the schedule

One line per work type per site. Group identical openings — that is what turns tickets into a programme.

Phase 2

1 in insulated Low-E, argon, warm-edge spacer

2.3 crew days · 2–3 wk lead

Phase 1

Offset pivots, closer rebuild or swap, sweep, force verified

0.8 crew days · 0–1 wk lead

Phase 1

1 in insulated tempered, made to size

1.3 crew days · 2–3 wk lead

Programme

4 weeks · 4.3 crew days
Programme — procurement then install, from the date the schedule is approvedPale bar is lead time. Solid bar is crew on site, two glaziers at eight hours a day.wk 0wk 1wk 2wk 3wk 4Building A · Door hardware service3 doorsBuilding B · Storefront lite replacement4 openingsBuilding A · Insulated unit replacement12 openingsPhase 1: Safety, security and egressPhase 2: Compliance and performancePhase 3: Upgrade and appearance

Sites

2

3 lines

Total units

19

openings, doors and linear ft

Crew days

4.3

Two glaziers, 8 hr days

Duration

4 wks

From approval to last install

Phasing

Phase 1 — Safety, security and egress7 units · 2.0 crew days · 3 wk lead

Anything broken, anything that will not lock, anything failing an egress requirement. This phase goes first regardless of what else is queued, because the exposure is not financial.

Phase 2 — Compliance and performance12 units · 2.3 crew days · 3 wk lead

Accessibility work and failed sealed units. Nobody is at risk, but the building is losing performance every month and an ADA complaint is a fast thing to file.

Crew days by site

Building A3.0 days

15 units across 2 lines

Building B1.3 days

4 units across 1 lines

Programmed vs called in one at a time

Scheduled as a programme this is 3 site visits. Reported ticket by ticket it is 3 separate mobilizations — the same glass, the same crew, the same measurement work repeated. Mobilization is most of the day on small commercial glass, which is why grouping the work is the single biggest lever a manager has.

Schedule of work

Building A — Insulated unit replacement1 in insulated Low-E, argon, warm-edge spacer · 2–3 wk lead · 2.3 crew days12 openings
Building A — Door hardware serviceOffset pivots, closer rebuild or swap, sweep, force verified · 0–1 wk lead · 0.8 crew days3 doors
Building B — Storefront lite replacement1 in insulated tempered, made to size · 2–3 wk lead · 1.3 crew days4 openings
Programme from approval4 weeks

Line items

3

Crew hours

34 hr

Jurisdiction

Fairfax

Hours

Business

A planning schedule, not a proposal. Crew hours assume two glaziers at eight hours a day on openings in sound condition with normal ground-floor access; lifts, night work, tight interior routes and corroded framing all move individual lines. Lead times run from approved submittals. Excludes structural modification, abatement, permits beyond routine coordination, engineering and stamped drawings. Rated assemblies — fire, ballistic or forced-entry — carry framing work that is scoped separately. A firm schedule of rates follows a walk of the properties.

Next step

Turn this into a schedule of rates

Send the schedule and our commercial desk walks the properties, fixes per-unit terms and sets response times you can put in a lease.

Total units

19

2 sites, 19 units, 4.3 crew days over 4 weeks

Property type
Office building
Sites
2
Line items
3
Total units
19
On-site crew days
4.3 days (2-person crew)
Programme duration
4 weeks from approval
Site visits programmed
3 vs 3 called in one at a time
Working hours
Standard business hours
Location
Fairfax / Loudoun / PW
Safety & security
7 units · 2.0 crew days · 3 wk lead
Compliance & performance
12 units · 2.3 crew days · 3 wk lead
Building A
15 units · 3.0 crew days
Building B
4 units · 1.3 crew days
10% Off Any Glass Work Licensed & insured 24/7 Emergency Service

Why portfolio glass is bought as a programme

On small commercial glass work, mobilization is most of the day. Getting a crew, a truck and the right material to a site takes the same effort whether they replace one insulated unit or twelve, which is why a single-unit call-out feels so disproportionate to the glass in it. Schedule forty units across three buildings and that fixed effort spreads across the whole run.

It changes how the work is bought as well as how long it takes. At portfolio scale the material is ordered in batches rather than one-off, the crew works in runs instead of driving between tickets, and one measurement visit covers a building rather than a window. Those are real efficiencies rather than a concession someone negotiated, which is why they hold.

Phase it in the right order

When a portfolio has to be split across budget years, the sequence that survives scrutiny is safety and security first — anything broken, anything that will not lock, anything failing an egress or accessibility requirement. Performance work such as failed insulated units comes second, because it is costing the building something every month but nobody is at risk. Fit-out and appearance go last. The one exception is long-lead procurement: glass railings and rated assemblies should be ordered in the phase before the one they install in.

What a schedule buys you that a quote does not

A quote answers one question once. A schedule of rates fixes the per-unit terms, the response time and the specification for every opening type in the portfolio, so the next broken lite is a work order instead of a procurement exercise. It also means the measurements, the glass make-up and the hardware are already agreed — which is most of the delay on an emergency call.

Questions people ask

Accurate enough to plan around, not accurate enough to sign. What a schedule like this gets right is the shape of the work — which line items dominate the crew days, where the long-lead procurement sits, and whether this is a two-week programme or a two-quarter one. What it cannot see is access, the condition of the existing framing, whether the openings are actually identical, and what the last contractor left behind. Those move individual lines rather than the sequence.