Most interior glass door work happens in a room somebody is living or working in, so the sequence matters as much as the specification. The survey visit is short. The fabrication happens off site. The installation visit is the only disruptive one, and it needs the opening clear, the floor protected and, for a barn track, access to the wall above the opening. Where a track has to go into blocking that does not exist, that is drywall work, and we will tell you at survey rather than discovering it with the panel already in the hallway. For office fit-outs we schedule around occupancy, including evenings, because a glass door going into a corridor closes that corridor while it happens.